What to upload with your panoramas, and why those fields matter
Uploading panoramas is the easy part. The fields around them are what stop a drafter guessing, and guessing is what turns a clean order into a revision round.
Country is not an address field
Country decides which measurement convention your plan is drafted to. UK, Australia and New Zealand orders are drafted to RICS; United States orders are drafted to ANSI. Change the country after drafting has started and the areas on the drawing change with it, so it is worth getting right at submission.
Tell us what the camera could not
- Rooms you deliberately skipped, and why — an empty loft reads the same as a missed room otherwise.
- Outbuildings, garages and anything detached: say whether they belong on the drawing.
- Split levels and half landings, which are easy to miss from panoramas alone.
- Anything mid-renovation, so the drafter does not draw a wall that is coming down.
Floor count
Panoramas do not carry floor numbers. If a property has three levels and the upload is one flat folder, the first job in production is working out which panorama belongs where. A one-line note saves that step and takes the order straight into drafting.