Cutting media turnaround from five days to overnight
Most agencies do not have a floor plan problem. They have a waiting problem: the photos are ready, the copy is ready, and the listing sits because one asset has not come back.
Three levers
- Pick the right clock per listing. Economy 48h for stock, Standard 24h as the default, Rush 12h for the ones that actually need it.
- Upload the night of the shoot, not the next morning. The queue does not sleep.
- Send corrections as notes with attachments rather than a phone call, so the editor works a list instead of a conversation.
What changes downstream
When media stops being the constraint, the listing goes live the day after the shoot. That moves the whole calendar — viewings, portal refresh, vendor reporting — forward by the same margin, on every property, without anyone working faster.
Rush is available on every plan as an add-on. Use it on the listings that actually need it rather than as a default.